跳至主要内容

Master AI General Contractor Certification · 数字课程

MA-GCC Level 2 — Certified AI Construction Professional

Self-paced enrollment in Level 2 of the Master AI General Contractor Certification: Apply AI to the everyday work of a general contractor: structured prompting for scopes, quote leveling, RFIs, submittals, change-order narratives, daily reports, safety documentation, and owner communication, with the verification, data-handling, and record-keeping habits that survive an audit, a claim, or an inspection.

模块
14
预计时间
40 小时
访问
自定进度

单用户报名

$499.00

一次性购买

报名包含

为建筑工作量身打造的专业 AI 培训

评估 AI 工具在建筑用例中的适用性、局限性、数据安全、安全、执照、规范以及专业审阅风险。

为估价、投标、工作范围、进度计划、项目记录和客户沟通创建可靠的提示词和核实程序。

改善项目文档和协调,同时不把安全、设计、法律、财务或规范方面的决定委托给模型。

以清晰的权限、审批、例外处理、审计轨迹和上报路径,自动化重复性的办公室和现场工作流程。

课程概览

从估价基础到建筑领导力

查看全部 14 个模块
  1. 第 01 模块

    From Foundations to Practice: The Level 2 Operating Model

    Level 2 puts the foundations to work on a contractor's ordinary day. This module triages a task before any tool opens, runs an assisted task from the project documents to a reviewed deliverable, reads a vendor accuracy claim for what was measured and on what, and keeps the project AI use record while the work happens.

  2. 第 02 模块

    Prompting Architecture for Construction Documents

    A reusable prompt for contractor work declares the project, jurisdiction, delivery method and contract form, supplies the documents at their revision instead of asking for recall, and tells the tool to refuse when those documents are silent. This module builds that architecture, refines it, and defends it against instruction-like text inside the documents themselves.

  3. 第 03 模块

    The Company Prompt Set: Ownership, Versioning and Retest Triggers

    A contractor's repeated prompts for estimating, documentation, field and customer work need an owner, a version, a test against a known answer before release, and a list of events that force a retest. This module builds that practice as this programme's recommendation, including how to supervise use and retire entries.

  4. 第 04 模块

    Controlled Drafting From a Verified Project File

    Build the verified project fact file for a live job, write closed-file drafting instructions that stop a model supplying anything the file does not hold, trace every statement in a draft back to its document, and hold the line between a first draft and a proposal, letter or notice that a named person releases.

  5. 第 05 模块

    Reviewing Specifications, Subcontracts and Submittals Against a Checklist

    Extract requirements from specification sections, subcontracts, purchase orders and submittals into a structured checklist a person verifies line by line, organise findings by the project's own classification conventions, compare terms against the prime contract, state what the checklist did not cover, and treat instruction-like text in supplied documents as a risk.

  6. 第 06 模块

    Project Records, Versions and the Reviewer Sign-Off

    Keep project records that show how an AI-assisted document was prepared, what evidence it rests on and who reviewed it; name the drawing and specification revision each document was written against; write a sign-off that says exactly what was checked; and keep records for the periods the law already sets, so they can answer a question years later.

独立的专业教育

MA-GCC 是一个独立的专业教育计划。它不是政府颁发的承包商执照,也不能取代州或地方的执照要求,或法律、建筑设计、工程、会计、安全、保险或规范合规方面的审查。AI 输出需要由合格人员依据适用的要求、经批准的图纸、制造商说明和公司程序进行审阅。该计划未获得 OSHA、任何执照委员会、行业协会、专业组织或政府机构的认可。不声称提供任何司法辖区的教育学时或批准,也不保证任何项目成果、规范批准、盈利或监管合规。