Lesson objective

Triage a manufacturing task on consequence, data class, export exposure, verifiability and who signs, then route it to standard review, enhanced review, redesign or no AI before any file reaches a tool.

Plain-language explanation

Why this matters now

Level 1 explained how AI tools build answers, where they fail with prints, tolerances and revision levels, why technical data and process knowledge need protecting, and which decisions belong to named people. Level 2 starts on an ordinary Tuesday. The quality technician has three supplier certificates to log, the planner has a customer asking about a late order, a process engineer wants a first draft of a setup sheet for a new part, and an estimator has a request for quote with a drawing package attached. An approved AI assistant is open on every one of their screens.

This programme will not open that day with a figure for how many manufacturers use AI or how much time it saves them. No verified source gives a manufacturing adoption percentage, and none measures an accuracy, productivity, scrap or downtime gain from AI in a running US plant.

The nearest controlled evidence comes from another profession, and it is a warning as much as an encouragement.

Triage is how one person decides, task by task, which side of that boundary a job sits on.

A question to sit with

At 7:15 a.m. a quality technician has two items. One is turning yesterday's handwritten receiving notes into the typed receiving log. The other is an operator's question: "The bore on job 5512 measured 0.0006 over. Can we ship it?" Both could be typed into the same assistant in under a minute. What makes them completely different tasks?

What goes wrong

Choosing the tool before the task. The assistant is open, so the question goes in, and nobody asks whether the answer should come from AI, a released document or a named authority.

Triaging on time pressure. "It saves ten minutes before the truck leaves" is a benefit, not a triage answer.

Deciding the data question after the upload. Once a customer's print, a process sheet or a quote package is inside a tool, the decision about whether it belonged there has already been made by default.

Forgetting that data can be exported without leaving the building. A drawing that never crosses a border can still be released to someone.

Assuming everything can be checked. A receiving log can be checked against the notes. "Can we ship it?" cannot be checked against any document the technician holds, because it is not a question about a document. It is a disposition.

Losing track of who signs. A draft moves from technician to supervisor to quality engineer, and each assumes one of the others checked it.

The practical answer

Ask five questions, in order, and write the answers down before any file is opened in a tool.

# Question What you are looking for Typical plant answers
1 Consequence: if this is wrong and nobody notices, where does it land? The furthest place the output travels An internal note; a controlled record; a customer; an operator at a machine; a shipped part
2 Data class: what would the tool see? The most sensitive item in the material Public catalogue data; company records; process parameters and cost models; a customer's print or model; employee information
3 Export exposure: could the material be controlled technical data? Whether anyone has classified it, and what they decided Not technical data; classified and cleared for this system; classified and controlled; not yet determined
4 Verifiability: can every part be checked against a released document you hold? The document and revision you would check against Fully; partly; only by redoing the work; not at all
5 Who signs? A named person with the authority the output needs The quality engineer; the planner's supervisor; the designated quality authority; the engineer of record; the officer who signs a representation

Question 1: follow the output to the end. A "quick note for second shift" is read by an operator who acts on it. Anything an operator could set up, run, inspect or ship from is a shop-floor consequence.

Question 2: settle the data class. What is the most sensitive thing this task would expose, and is a system approved for that class?

Question 3: settle export exposure before the prompt. This is the sharpest trap in the trade.

Whether a licence is needed depends on how the item is classified and where it is going. Who counts as a foreign person is defined elsewhere in the regulations and is never settled at a desk: route it to the person your company named to decide export questions. Sending technical data to an outside service can raise both questions at once.

The working rule for this programme: undetermined stops the work. If nobody with authority has decided what a file is, no tool sees it until they have.

Question 4: name the document and revision. The receiving notes dated yesterday; the print at revision D. If the answer is "nothing I hold," the task needs redesign or no AI.

Question 5: name who signs. A plant has no single person who owns everything. The signer changes with the output.

Output Who signs or decides
A receiving log entry or status note The person the procedure names, usually the quality technician's lead
A customer delay or status message The planner or customer service lead who owns the account
A nonconformance disposition, a certificate of conformance, a lot release The designated quality authority the quality system names
A drawing or specification change, where a state requires a seal The licensed engineer, subject to that state's rules and exemptions
An export classification or licence decision The person the company has named to decide export questions
A representation to a customer or a government agency The officer or owner who signs it

Now turn the five answers into a route.

Route When it applies What happens next
A: proceed, standard review Internal consequence; data cleared; no export exposure; fully verifiable; signer named Run the Lesson 2 workflow; the preparer checks every item
B: proceed, enhanced review Output reaches a controlled record, a customer or the floor; data and export cleared; fully verifiable; signer named Run the workflow; the signer checks every dimension, revision, quantity and date
C: redesign, then triage again Data or export status not cleared, or part of the output checkable only by redoing it Remove the material, get a classification, or split the checkable part from the judgement
D: no AI for the decision The output would disposition a part, release a lot, sign a conformance statement, approve a corrective action, clear a machine for restart or decide something is safe Route the decision to its named authority; AI may later help record what that person decided

Why write it down. Best practice: the NIST AI Risk Management Framework (AI RMF 1.0, January 2023; voluntary, and being revised) states in Appendix C that human roles in decision making and oversight "need to be clearly defined and differentiated." A one-line triage entry is where a small plant makes that true for one task. Nothing in the framework binds a manufacturer.

Remember this

  • Triage before any tool sees a file: consequence, data class, export exposure, verifiability, who signs.
  • Anything an operator could set up, run, inspect or ship from is a shop-floor consequence.
  • Export follows the data: a release to a foreign person inside the United States can be an export. Undetermined stops the work.
  • A disposition, release, conformance statement, corrective-action approval or restart clearance is Route D, whatever inbox it arrived in.
  • Trade-secret protection rests on reasonable measures, which are facts about what the company actually did.

Manufacturing example

Kestrel Precision Machining is a fictional 60-person job shop with an assistant the owner has approved for company records and customer correspondence, but not for customer technical data. On a Tuesday the quality technician, Imogen Achterberg, triages four items before opening it. Item one: type yesterday's receiving notes for three bar-stock deliveries into the receiving log. Consequence: a controlled record. Data: company records, cleared. Export: no technical data. Verifiable: fully, against the notes and purchase orders 22-417 to 22-419. Signer: her lead, Tobias Wren. Route B. Item two: the planner asks her to summarise a customer's emailed quality clauses. The email attaches a drawing marked with an export notice. Imogen stops: nobody has determined what the drawing is. Route C; she forwards it to the shop's named export contact, Ruth Salazar, and waits. Item three: an operator asks whether a bore measured 0.0006 inch over the print limit can ship. Route D; the measurement, print revision C and gauge record go to the quality manager, Anders Moyo, who holds disposition authority. Item four: the plant manager wants a restart checklist for a press after a die change "written by the assistant". Imogen routes the clearance decision D for the maintenance lead and notes that a draft checklist would need its own triage. The four lines take seven minutes and are written before any work starts. Two days later Ruth records the drawing as controlled, so the customer's quality clauses are summarised by hand from the email text alone, and the triage line is updated to show why.

Responsible-use warning

Do not let an approved tool make triage feel unnecessary. Approval means the company cleared a system for certain data classes and uses. It does not settle whether a particular print is export-controlled, whether every output can be checked, or who has authority to sign. The two costliest mistakes in a plant are asking a model whether a part can ship, and uploading a customer file whose export status nobody has determined. Triage the task, not the tool, and write the route down first.

Human-review requirement

The person who will sign or decide confirms the triage before work starts: the technician's lead for routine controlled records, the account owner for customer messages, the designated quality authority for anything touching a disposition, a release or a conformance statement, and the person the company named for export questions whenever technical data may be involved. The reviewer checks that consequence was followed to the floor, the data class and export status are settled rather than assumed, a released document at a stated revision exists to check against, and a name is on the task. Anyone may move a task to a stricter route; AI never assigns the route.

Practical exercise

Use a fictional plant, fictional customers and fictional part numbers only.

  1. List eight tasks from a typical week in your role, such as a receiving log, a status message, a setup sheet, a supplier email, a quote narrative, a nonconformance description, a toolbox talk and a shipping question.
  2. Replace every real customer, part number, print and price with a fictional one.
  3. For each task, follow the output to its final destination and mark any task an operator could set up, run, inspect or ship from.
  4. Record the most sensitive item each task would expose and whether an approved system covers that class.
  5. For each task, write whether the material could be technical data and who in your fictional plant decides. Mark any task where the answer is not yet determined.
  6. Name the released document and revision you would check each output against.
  7. Name the signer from the table in this lesson.
  8. Assign a route, A to D.
  9. For each Route C task, write what would move it to Route A or B, and who must act first.
  10. For each Route D task, write which answer ruled AI out and who receives the decision.
  11. Ask a colleague to triage the same eight tasks blind, compare, and note which question caused each disagreement. Record the results in your workbook.

Knowledge check

  1. What are the five triage questions in this lesson, and when are they answered?

    Answer guidance: Consequence if wrong, data class, export exposure, verifiability and who signs. They are answered and written down before any file reaches a tool.

  2. Why is "can this out-of-tolerance part ship?" a Route D task?

    Answer guidance: It asks for a disposition. Only the designated quality authority named by the quality system may decide it, so AI does not make or draft that decision.

  3. What does "undetermined stops the work" mean in export triage?

    Answer guidance: If nobody with authority has decided whether a file is controlled technical data, no tool sees it until the person the company named for export questions has decided.

  4. What did the consultant experiment find outside the AI capability frontier, and how far does it apply to a plant?

    Answer guidance: People using AI were 19% less likely to produce correct solutions than those without it. The subjects were consultants using a 2023 model, so it applies to a plant only by analogy.