Lesson objective

Build an as-run map of a plant workflow that captures the undocumented steps, the exception paths and the people everyone depends on, on every shift, before any AI step is designed.

Plain-language explanation

Why this matters now

Module 1 argued that a plant should understand how work actually runs before deciding how to control it. This module does that work. The tool is a map, and the first rule of the map is that it shows the work as it is done, not as the procedure says it should be done.

Most plants already have process documents: a router, a work instruction, a quality procedure, perhaps a flowchart drawn for a registrar audit. Those documents describe the intended process. The process that runs on second shift on a Friday, with one inspector out and a truck waiting, is often different, and the differences are exactly where an AI step will either help or do harm.

Professional guidance (voluntary framework): NIST's AI RMF 1.0 (NIST AI 100-1, January 2023) says that, after instituting its GOVERN outcomes, "most users of the AI RMF would start with the MAP function" and continue to MEASURE or MANAGE, iteratively. MAP, MEASURE and MANAGE "can be applied in system-specific contexts and at specific lifecycle stages." It is voluntary, binds no manufacturer, and NIST's web page says 1.0 is being revised; nothing here describes a revised version. NIST gives the function its name; it does not prescribe a plant mapping method.

Professional standard (voluntary consensus standard): ISO 9001:2026, Edition 6, which ISO's page says was published on 16 September 2026, covers topics that include the context of the organisation, planning, support and operation. It is voluntary: it is not law anywhere in the United States, and a plant is held to it only where a customer contract requires it or the plant chooses certification from an independent certification body. This programme has not read its text, found no AI-specific requirement in it, and quotes no clause. If your plant is certified, your process maps may already feed your quality system; the as-run map in this lesson is a separate working tool.

No source in this programme prescribes a mapping method for AI-assisted manufacturing work. The method below is this programme's own, an AI Coalition Network recommendation, not a legal, quality-system or customer requirement.

A question to sit with

Your receiving procedure has five boxes. When you stand at the dock on second shift for an hour, you count nine steps, two phone calls to the same retired-and-rehired inspector, and one spreadsheet nobody mentioned. Which of those would an AI tool be built around if you designed it from the procedure?

What goes wrong

The map is drawn from the procedure. It shows the five boxes. The tool is designed for five boxes, and on the first night it meets the other four steps, it produces output that fits the procedure and not the work.

The map is drawn by the person who owns the procedure. The quality manager draws what should happen. The people who know what does happen are the second-shift receiver, the third-shift lead and the material handler, and they are rarely in the room.

Exceptions are left off. The main path of a workflow is often the easy part. The paperwork burden, and the risk, live in the exceptions: a material certificate that does not match the purchase order, a part that arrives at a superseded revision, a customer that sends a deviation by email. A map with no exception paths hides where most of the judgement happens.

The person everyone asks is invisible. Many plants depend on one experienced person whom everyone calls when something is odd. That person is a step in the process, a single point of failure, and often the real reviewer. A map that leaves them off overstates how much the documented review catches.

One shift is mapped for all. First shift has an engineer down the hall; third shift has nobody. The same five boxes run differently when there is no one to ask.

The future state is drawn over the present. People sketch the AI step into the map before they have finished mapping what exists, and the map becomes a design proposal rather than a record.

The practical answer

Map by watching, on every shift. Walk the workflow with the people who do it, at the times they do it. AI Coalition Network recommendation: observe at least one full cycle on each shift that runs the task, including a busy period, and ask each person what they do when something does not match.

Use a small, fixed set of symbols. The map does not need specialist software. It needs the same few elements every time, so anyone can read it.

Element What to record Question to ask
Step What is done, by which role, on which shift Is this step in any written procedure?
Input The document, record or physical item used, and its revision Where does this come from, and is it the released version?
Handoff Who passes what to whom What is lost or assumed at this point?
Review point Who checks what, against which source What evidence shows the check happened?
Record Where the lasting record is created, in which system Is this the system of record or a copy?
Exception path What happens when an input does not match Who decides, and how is it recorded?
Dependency A person, spreadsheet or habit the step relies on What happens when they are absent?
Boundary crossing Any point data leaves a system, a building, a programme or the plant What data class is crossing, and to whom? (Lesson 3)

Eight elements. Handoffs, review points and records are the subject of Lesson 2; boundary crossings are Lesson 3; measurement is Lesson 4.

Mark undocumented steps plainly. Best practice: draw each step found only by observation in a different colour or with a mark, and write beside it who does it and why. An undocumented step is not automatically wrong. Some are the reason the process works. The map's job is to make them visible so a decision can be made: write it into the procedure, remove it, or design around it.

Name the person everyone asks, as a dependency. Write the role, the questions they answer, and what happens on the shifts when they are not there. If the answer is "the lot waits" or "the lead guesses", that is a finding in its own right, and an AI step placed downstream of that gap will inherit it.

Draw the exception paths to the end. For each exception, follow it until a named person makes a decision and a record exists. Many exception paths end in an email that nobody files. Those are the places a later AI step is most tempted to "fill in", and the places it must not.

Keep the as-run map separate from the design. Draw the present state first and have the people who do the work confirm it. Only then, on a copy, sketch where an AI step might sit. AI Coalition Network recommendation: date and sign the as-run map, and keep it with the operation file, so a later reviewer can see what the plant knew before it changed anything.

Watch for the human-AI configuration you are about to create. Professional guidance (voluntary framework): NIST AI 600-1 (July 2024) lists Human-AI Configuration among its twelve generative AI risks, including "automation bias, over-reliance" and "algorithmic aversion." A map shows where people currently judge. Place an AI step where the judgement is, and you change who judges. Mark those points before you design.

Remember this

  • Map the work as it runs, on every shift, by watching and asking the people who do it.
  • Use eight fixed elements: step, input, handoff, review point, record, exception path, dependency and boundary crossing.
  • Undocumented steps, exception paths and the person everyone asks are where the judgement and the risk live.
  • Keep the signed as-run map separate from any future design.
  • No source prescribes a mapping method for AI-assisted plant work; this one is the programme's own.

Manufacturing example

Ostara Medical Devices is a fictional contract manufacturer. Its receiving inspection procedure has five steps: receive, check packing slip, check material certificate against the purchase order, sample inspect, release to stock. The quality engineer, Nadia Ferro, wants to add an AI tool that compares each material certificate with the purchase order and drafts a discrepancy list. Before designing anything, she spends an hour at the dock on each of the two shifts. On first shift she counts seven steps: the five in the procedure, plus a call to buyer Luis Ortega whenever the heat number format is unfamiliar, and a note in a shared spreadsheet that tracks certificates the supplier has promised to resend. On second shift she counts nine. There is no buyer to call, so receiver Joy Adeyemi texts Harold Kim, a retired inspector rehired part-time, who answers from home; and when a certificate is missing, Joy places the material on a shelf marked "pending cert" with a handwritten tag. Neither the text to Harold nor the pending-cert shelf appears in any procedure. Nadia draws the as-run map with the eight elements, marks the four undocumented steps in red, and follows each exception path to its end. The pending-cert path ends with a handwritten tag and no record in the ERP. She lists Harold as a dependency: on the two nights a week he does not answer, material waits or the receiver guesses. Joy and Luis each confirm their part of the map, and Nadia signs and dates it. Her first finding has nothing to do with AI: the pending-cert path needs a record. Her second is that an AI tool designed from the five-step procedure would never have seen the two steps where most of the judgement happens.

Responsible-use warning

Do not draw the map from the procedure, in a meeting room, with only the people who own the procedure. That produces a map of intentions. Do not leave off exception paths or the person everyone asks because they are awkward or informal; they are where the judgement lives. And do not sketch the AI step into the map before the people who do the work have confirmed the present state, or the map becomes a sales drawing for a design nobody tested.

Human-review requirement

The operation owner signs and dates the as-run map and keeps it in the operation file. People from each shift that runs the task confirm their part. Where the map shows the real process differs from a controlled procedure, the person who owns that procedure under the plant's quality system decides whether to change the procedure or the practice. The person the quality system names for release decisions confirms the map shows every point where a release or disposition is made, and that none is shown as made by a tool.

Practical exercise

Use a fictional plant and invented material only.

  1. Choose one paperwork-heavy workflow in a plant, such as receiving inspection, first-article packages or shift handover.
  2. Write the steps the written procedure describes.
  3. Describe how you would observe the workflow on each shift, including a busy period, and whom you would ask.
  4. Using invented observations, draw the as-run map with the eight elements in this lesson.
  5. Mark each step found only by observation, and write beside it who does it and why.
  6. Follow every exception path until a named person decides and a record exists. Mark any path that ends without a record.
  7. Name the person everyone asks, the questions they answer, and what happens on shifts when they are absent.
  8. Mark every point where people currently exercise judgement, and note how an AI step placed there would change who judges.
  9. Write the sign-off block: the operation owner, one confirmer per shift, and the date.
  10. List every difference between the written procedure and the as-run map, and name the person who owns that procedure under the plant's quality system and will decide what to do about each.
  11. Only on a separate copy, sketch where an AI step might sit, and write which confirmed step it would change.

Knowledge check

  1. Why must the as-run map be built by watching the work on every shift rather than from the written procedure?

    Answer guidance: The procedure shows the intended process. The work that actually runs often has undocumented steps, exception paths and dependencies that differ by shift, and an AI step designed from the procedure would meet those unprepared.

  2. Name the eight elements of the map used in this lesson.

    Answer guidance: Step, input, handoff, review point, record, exception path, dependency, and boundary crossing. Each is recorded the same way every time so anyone can read the map.

  3. Why is the person everyone asks recorded as a dependency?

    Answer guidance: They are a real step and often the real reviewer, and a single point of failure. Recording what happens when they are absent shows how much the documented review actually catches without them.

  4. Does ISO 9001:2026 prescribe a method for mapping AI-assisted plant work?

    Answer guidance: No. It is a voluntary quality standard, not law, and this programme found no AI-specific requirement in it and quotes no clause. The mapping method here is this programme's own recommendation.

Sources and further reading